13th December 2016: with Nick and Tav.
The dig at the end of Chamber 20 has dried up, it’s a bit claggy on the top but underneath it is relatively dry, at least it was where we reduced the level for the drystone wall. Nick decided to roll some rather large boulders down the slope for use in the next stepped wall and some of them took quite a lot of effort to position. It was very warm work indeed.
We plan to return on Thursday evening to continue the project.