9th March 2016: with Dave Turner, et al.
I had been off work today, not feeling too good, but arrangements had already been made and there was a job to do. First job was to go and check out the South Pot while Dave T went ahead to start drilling holes in the North Pot. Quickly sorted out the South then headed North to join Dave T. Holes drilled, prep done, time to leave and conclude a satisfactory evenings work. There should be plenty to clear next week.