1st May 2018: with Jake, Tav, Jonathon, Duncan and Mike.
A bigger turn-out than expected for this digging session.
At the Sand Dig, Mike digging, Tav shifting the filled buckets back up to Jonathon, who was loading the skip and, in between time, dismantling some of the old spoil heaps at the top of the dig. I was on the slope, helping to haul the skip, Jake and Duncan, sharing the hauling and spoil dispersal tasks.
We need plenty of room at the top to slope down, allowing the digging to go deeper, hence, the moving of some of the old spoil heaps. The rocks will be useful for building walls later.
By the end of the session, a large quantity of spoil had been removed but, there’s plenty more to shift.