26th April 2018: Brockers, Nick, Jake, Jonathon, Roz, Duncan, Mike and Alex.
A big team assembled this evening, keen to get the Sand Dig re-started, it might have been bigger had others been able to attend. Roz and I had arrived a little late, the rest of the team were ready, so off they went with the skip and ropes, Brockers had brought along some ropes as well.
At the dig, Jake, Nick and Brockers were digging and emptying the filled buckets into the skip. Hauling was carried-out by Jonathon and Mike; the rest of the team were assigned the task of spoil dispersal. Water was poured down the slope, an effort to ease the passage of the skip, it worked for a while, on the down-side, it also had the effect of muddying the rope making it difficult to grip. One of the spare ropes was knotted-up and replaced the slippery rope, making the haul a bit easier.
At the end of the session, a lot of spoil had been shifted. The sediment comprises mostly silty, fine to medium grained sand with the occasional cobble of limestone. There’s plenty more of it to shift too!